Ocean freight planned around a multi-country supplier base
Most U.S. companies diversifying their sourcing end up with suppliers in two, three or four Southeast Asian countries at once. Ocean freight from the region is therefore not a single lane. It is a network of deep-sea gateways with transpacific services, plus smaller ports that usually feed those gateways by feeder vessel. Junction Pacific plans each shipment from the factory gate: we choose the port of loading that suits your supplier's location, align the booking with cargo readiness, and coordinate the U.S. side through to your warehouse.
We arrange both full container load (FCL) and less than container load (LCL) shipments, and we can combine cargo from several suppliers or countries when that improves cost or control. See factory pickup and consolidation for how that works.
Origin gateways and indicative transit times
The ranges below are indicative port-to-port times to the U.S. West Coast (Los Angeles/Long Beach). They vary by carrier, routing, transshipment and season. East Coast all-water services typically add roughly 10–14 days.
| Origin gateway | Typical supplier regions | Indicative to West Coast | Routing reality |
|---|---|---|---|
| Cai Mep / Cat Lai, Vietnam | Ho Chi Minh City, Binh Duong, Dong Nai, Long An | 18–26 days | Many deep-sea calls at Cai Mep; Cat Lai cargo may be barged or trucked to the vessel |
| Hai Phong, Vietnam | Hanoi, Bac Ninh, Bac Giang, Hai Duong | 20–28 days | Mix of direct and transshipment services depending on carrier |
| Da Nang, Vietnam | Central Vietnam | 25–35 days | Usually transshipment; routing confirmed per sailing |
| Laem Chabang, Thailand | Bangkok, Eastern Seaboard (Chonburi, Rayong) | 20–28 days | Varies by carrier and service rotation |
| Port Klang, Malaysia | Klang Valley, Selangor | 22–30 days | Penang cargo is often fed via Port Klang or Singapore |
| Tanjung Priok, Indonesia | Greater Jakarta, West Java | 24–32 days | Frequently transshipped at a regional hub |
| Manila, Philippines | Metro Manila, CALABARZON | 18–26 days | Routing confirmed per sailing |
| Singapore | Singapore, Johor (by cross-border trucking) | 18–25 days | Major transshipment hub for the region |
| Sihanoukville, Cambodia | Phnom Penh, Sihanoukville SEZ | 25–35 days | Usually transshipment |
We never assume a direct service exists from a smaller port. The actual routing, transshipment point and vessel are confirmed for each sailing at booking.
How an ocean shipment runs
- Routing and quote. We review supplier locations, cargo profile, Incoterms® and required delivery date, then recommend FCL, LCL or a consolidation plan.
- Booking and cargo readiness. Space is booked against a realistic ready date, not the date on the purchase order.
- Origin pickup and export clearance. Trucking from the factory and export formalities are handled by the supplier or an origin agent, depending on your Incoterms.
- ISF filing. For U.S.-bound ocean cargo, the Importer Security Filing must be submitted at least 24 hours before loading at the foreign port. See our ISF 10+2 guide.
- Departure and tracking. We monitor the main vessel and any transshipment leg and flag roll-overs early.
- U.S. arrival and entry. A licensed U.S. customs broker files the entry; the importer of record remains responsible for it. See customs clearance coordination.
- Delivery. Port drayage, IPI rail to inland points or truck delivery, covered in door-to-door shipping.
What affects your ocean freight cost
Ocean pricing is built from several independent components, so two shipments of the same volume can price very differently:
- Container size or chargeable volume: per container for FCL, per weight/measure (W/M) for LCL.
- Origin port and feeder legs: a transshipment from Da Nang or Sihanoukville adds handling and time.
- Season and space: pre-holiday peaks and general rate increases move pricing quickly.
- Surcharges: fuel adjustment, peak season and terminal charges set by carriers.
- U.S. destination charges: terminal handling, chassis, drayage, and any demurrage or detention.
- Duties, taxes and fees: driven by HTSUS classification and country of origin, not by the freight.
Run your cargo through the quote tool for a freight estimate and the landed-cost estimator for duty exposure.
What can go wrong
- Rolled bookings during peak season when carriers overbook a vessel.
- Missed connections at a transshipment hub, which can add a week or more.
- Late ISF or data that does not match the bill of lading, exposing you to liquidated damages of up to US $5,000 per violation.
- Country-of-origin errors when goods from several countries share one container; each line must be declared under its true origin.
- Free time expiring at the U.S. terminal because delivery appointments were not lined up in advance.
We build these risks into the plan rather than reacting to them after the vessel sails.
Lane data
| Origin gateway | U.S. gateway / region | Method | Indicative transit | Online pricing |
|---|---|---|---|---|
| Cai Mep – Thi Vai (VNCMT) | Port of Los Angeles (USLAX)U.S. West | Ocean FCL | 18–26 days | Specialist quote |
| Hai Phong (incl. Lach Huyen) (VNHPH) | Port of Los Angeles (USLAX)U.S. West | Ocean FCL | 20–28 days | Specialist quote |
| Laem Chabang (THLCH) | Port of Los Angeles (USLAX)U.S. West | Ocean FCL | 20–28 days | Specialist quote |
| Port Klang (MYPKG) | Port of Los Angeles (USLAX)U.S. West | Ocean FCL | 22–30 days | Specialist quote |
| Tanjung Priok (Jakarta) (IDTPP) | Port of Los Angeles (USLAX)U.S. West | Ocean FCL | 24–32 days | Specialist quote |
| Singapore (SGSIN) | Port of New York & New Jersey (USNYC)U.S. Northeast & Mid-Atlantic | Ocean LCL | 33–43 days | Specialist quote |
Transit times are indicative ranges from published schedules and vary by carrier, routing and season.
Frequently asked questions
Do you offer direct sailings from every Southeast Asian port?
No forwarder can promise that. Some gateways such as Cai Mep and Singapore have many transpacific calls, while ports like Da Nang, Sihanoukville and Penang usually connect through a hub. We confirm the routing and any transshipment point for each sailing at booking.
How long does ocean freight from Vietnam to the U.S. take?
Indicatively, Cai Mep to the West Coast runs about 18–26 days port-to-port and Hai Phong about 20–28 days, with East Coast services typically 10–14 days longer. Actual times vary by carrier, routing and season.
Should I ship FCL or LCL?
As a rough rule, LCL tends to make sense for smaller volumes and FCL becomes competitive as you approach half a container or need tighter control. The quote tool compares both for your actual cargo.
Who files the ISF for my shipment?
The ISF is the importer's responsibility, usually filed through a licensed customs broker or a filing agent using data from the supplier. It must be filed at least 24 hours before loading at the foreign port.
Can I combine cargo from suppliers in different countries?
Often, yes. Cargo can be consolidated at a hub such as Singapore or at a CFS in Vietnam, but each line keeps its own country of origin and documentation, and the arrangement is confirmed case by case.